led glowing plastic furniture CE UL ROHS

FOB Reference Price:Get Latest Price
  • >=30 Pieces
    US $84.00
Report Suspicious Activity
Overview
Quick Details
Type:
Furniture Leg, Living Room Furniture
Material:
Plastic
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
XGC
Model Number:
S306
Specific Use:
Living Room Set
General Use:
Home Furniture
Appearance:
Modern
Folded:
No
Supply Ability
Supply Ability:
10000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
packaging materials:
inside:pp bag
outside: standard carton
Port
Shenzhen


l  
Production Description:

   

 

Item No.: S306

Material: PE (polyethylene) + Built –in  LED lights

Size:   67*H40 cm

Control: Remote Control via Remote

Power supply: 100-240V 50.60Hz  (OUTPUT: 5 V 1A)

Battery: 4400mAh, 3.7V rechargeable lithium battery

Charge time: 6-8 hours ,   Lasting Time: 12 ~ 14 Hours

LED Life: ≥ 50,000 hours

Working temperature: 0 - 50 °C

 

More photos

 

l  Accessories & Certificates

 

1.    Adaptor

 

 

2.    Remote

 

3.    Certificates

 

 

l  Packing & Shipping

  

l  Our product series

1.Furniture:

Main products: table, chair, stool,sofa, wine cabinet

2.Furnishing:

Main products: fruit plate/food plate,ice bucket,wine cooler,pillow,table cover,chair cover,curtain

3.Decorations:

Main products: flower pot/ vase.ball, pillar,decoration lights, decoration trees, Christmas decorations

 

Application:

Hotels& entertainment: bar, coffee ship, banquet hall, party, club

Outdoor leisure place: Garden, park, pool, beach, tourist attractions, public

Commercial center: Exhibition, mall, office, Wedding photography studio, conference room

  

l  Company information

 1.    We are Professional LED PE furniture manufacturer since 2007 in China.

 2.    Modern style: With rich experience R&D team, and develop new styles to satisfy customers for each year.

 3.    High quality: With best SMD5050 led RGB lights, which is with soft light and long lifespan. and our battery  is 4400MAH rechargeable lithium battery, it can be running about 10 ~12 hours

 4.    Favorable price: With advanced equipment to improve working efficiency and reduce production cost.

 5.    Prompt delivery: 7-20 days (our normal mass production time is about 20 days, we can adjust the delivery time as per customer's demands)

 6.    Certificates: CE,ROHS,UL